Engineered Wood Flooring Installation
Home > Customer Service >

kd Panels for decoration

This page is the installation guideline of kd panels for decoration.

Nail-down and Staple-down Installation 

Guide
‧ Lay down the moisture barrier on the floor.
‧ Nail down plywood base over the moisture 
  barrier.
‧ Nail down the engineered flooring over the 
  plywood base.
‧ Fill the gap between flooring and wall edge with 
  silicon or install skirting board.
     

Glue-down installation
‧ Lay down the EVA sound insulation on the ground.
‧ Install engineered flooring over the EVA sound 
  insulation.
‧ Fill the gap between flooring and wall edge with 
  silicon or install skirting board.
‧ Glue-down installations can be done over marble 
  ground or other rigid grounds.
    

Elevated floor
‧ Lay down the moisture barrier on the ground.
‧ Fix lumber of desired height over the moisture 
  barrier.
‧ Nail down plywood over the lumber.
‧ Nail down the engineered flooring over plywood.
‧ Fill the gap between flooring and wall edge with 
  silicon or install skirting board.