SEARCH PRODUCTSSearch

Engineered Wood Flooring Installation

Engineered Wood Flooring Installation(橫幅)

Engineered Wood Flooring Installation



Guide
• Lay down the moisture barrier on the floor.
• Nail down plywood base over the moisture barrier.
• Nail down the engineered flooring over the plywood base.
• Fill the gap between flooring and wall edge with silicon or install skirting board.
      


Glue-down installation
• Lay down the EVA sound insulation on the ground.
• Install engineered flooring over the EVA sound insulation.
• Fill the gap between flooring and wall edge with silicon or install skirting board.
• Glue-down installations can be done over marble ground or other rigid grounds.
      


Elevated floor
• Lay down the moisture barrier on the ground.
• Fix lumber of desired height over the moisture barrier.
• Nail down plywood over the lumber.
• Nail down the engineered flooring over plywood.
• Fill the gap between flooring and wall edge with silicon or install skirting board.
Back to list
BACK TO TOP